Skip to main navigation.

Commercial Rates

Current Small Commercial Single-Phase Rate (SMLCO)

Available to commercial users for single-phase service with 30 kW or less of coincidental load, subject to the rules, regulations, and bylaws of CEC. 

G & T Charges:

$0.053387 per kWh

Generation Recovery:

$0.01973 per kWh

Distribution Charge:

$0.034278 per kWh

Base Charge:

$28.50 per meter per month

 

 

Current Commercial Three-Phase Under 30 kW Rate (SM3CO)

Available to commercial users for multi-phase service with 30 kW or less of coincidental load, subject to the rules, regulations, and bylaws of CEC. 

G & T Charges:

$0.053387 per kWh

Generation Recovery:

$0.01973 per kWh

Distribution Charge:

$0.035182 per kWh

Base Charge:

$49 per meter per month

 

 

Current Large Commercial Over 30 kW Rate (LGCO2)

Available to commercial users for single-phase and multi-phase service with coincidental load greater than 30 kW at any time on CEC's system, subject to the rules, regulations, and bylaws of CEC. 

First 200 kWh/kW:

$0.030334 per kWh

Next 200 kWh/kW:

$0.022396 per kWh

Over 400 kWh/kW:

$0.014573 per kWh

All kW Demand:

$5.65 per kW

Generation Recovery Charge:

$0.01973 per kWh

Per kWh:

$0.022118 per kWh

First 500 kW Demand:

$4.55 per kW

Over 500 kW Demand:

$3.25 per kW

Base Charge: 

$54 per meter per month

 

 

Current Large Commercial Self-Generation Rate (L4GEN)

Available to commercial users for single-phase and multi-phase service with coincidental load greater than 30 kW at any time on CEC's system that generates power for resale, subject to the rules, regulations, and bylaws of CEC. 

Energy Rate:

$0.016673 per kWh

Demand Rate:

$5.65 per kW

CP Demand Rate:

$4.75 per CP kW

PJM High 5 Coincident Rate:

$4.35 per kW

Generation Recovery Charge:

$0.01973 per kWh

Per kWh:

$0.022118 per kWh

Demand - Billing Demand

(Greatest of:)

  • Actual Demand.
     
  • 50 percent of the lesser of either the rated capacity of the customer owned generation or the rated capacity of the installed transformer capacity. 
     
  • OR, 50 percent of highest demand occurring in prior 12 months. 

First 500 kW Demand:

$4.55 per kW

Over 500 kW Demand:

$3.25 per kW

Base Charge:

$54 per meter per month

 

 

Current Large Commercial with Primary Metering Rate (LGCP2)

Available to commercial users for single-phase and multi-phase service with coincidental load greater than 30 kW at any time on CEC's system, subject to the rules, regulations, and bylaws of CEC. 

First 200 kWh/kW:

$0.030334 per kWh

Next 200 kWh/kW:

$0.022396 per kWh

Over 400 kWh/kW:

$0.014573 per kWh

All kW Demand:

$5.65 per kW

Generation Recovery Charge:

$0.01973 per kWh

Per kWh:

$0.022118 per kWh

First 500 kW Demand ($-0.50):

$4.05 per kW

Over 500 kW Demand ($-0.50):

$2.75 per kW

Base Charge:

$54 per meter per month

 

 

 

Minimum Charge

The minimum charge is $54, or $1 per KVA of required transformer capacity, whichever is greater. 

 

 

Minimum Annual Charge for Partial-Year Service

Consumers requiring service only during certain parts of the year may guarantee a minimum annual payment of twelve times the monthly minimum charge, in which case there will be no monthly minimum charge. 

 

 

Primary Service

If service is furnished at primary distribution voltage, a discount of $0.50 per kW of demand shall apply. Seller shall have the option of metering at secondary voltage and adding estimated transformer losses to the metered kilowatt-hours and kilowatt demand. 

 

 

Back to About Rates Page. 

Powered by Touchstone Energy Cooperatives Logo
Link to togetherwesave.com Nothing here. link to the cooperative action network website